System and method for handling a production disturbance/opportunity event in a production execution system
Abstract
A system for handling a production disturbance/opportunity event includes a network having data processing units running a MES software for controlling/monitoring a production process operating production components. A production modeler defines a plant model of the production process, and a production scheduler generates an executable production schedule for the execution of operating procedures for the production components. A production executor executes the production process following the generated executable production schedule, and a production disturbance/opportunity event identifier detects a production disturbance event and identifies a production opportunity event which allows to maintain an efficiency of the production process at least as close as possible to an efficiency given by the executable production schedule as originally generated by the production scheduler. The production scheduler re-calculates an amended executable production schedule incorporating the identified production opportunity event, and the production executor executes the production process now following the re-calculated executable production schedule.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 9.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for handling a production disturbance/opportunity event in a production execution system, comprising: a network comprising a plurality of data processing units running a MES software for at least one of controlling and monitoring a production process operating a number of production components; a production modeler within the MES software enabled to define a plant model of the production process; a production scheduler within the MES software enabled to generate an executable production schedule for the execution of operating procedures for the production components related to the pla
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (9 of 9 total)
References Cited — Backward Prior Art (10)
Non-Patent Literature (2)
- Derwent Abstract-EP 0 987 613 A2; Mar. 22, 2000; Basf Aktiengesellschaft, D-67056 Ludwigshafen, Germany.
- Derwent Abstract—EP 0 987 613 A2; Mar. 22, 2000; Basf Aktiengesellschaft, D-67056 Ludwigshafen, Germany.