Patents
US 7,958,494 B2#2588727 Most CitedActiveUnited States (USPTO)Utility

Rapid on-boarding of a software factory

28Forward Citations (#2588727 Global)
1.9/yrCitation Velocity (#2368064 Global)
2.74Citation PageRank (#8784164 Global)
28Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method, system, and computer-readable medium for rapid on-boarding of a software factory are presented. In a preferred embodiment, the computer-implemented method comprises the steps of: identifying choke-points in a first software project; creating a checklist of identifying factors that caused the choke-points that were identified in the first software project; receiving a new software project at a software factory, wherein the new software project is in a same software category as the first software project; presenting the checklist for the first software project; receiving new answers to the checklist; determining if the software factory is ready to handle the new software project based on the new answers to the checklist; and in response to determining that the software factory is ready to handle the new software project, configuring the software factory in a same configuration as that previously used by the first software project.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 28.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method for configuring a software factory, the computer-implemented method comprising: identifying, using a computer, choke-points in a first software project; creating, using the computer, a checklist of identifying factors that caused the choke-points that were identified in the first software project; receiving, using the computer, a new software project at a software factory, wherein the new software project is in a same software category as the first software project; presenting, using the computer, the checklist for the first software project; receiving, using the

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (28)

PatentTitleYearCitations
US 6,226,784 B1Reliable and repeatable process for specifying developing distributing and monitoring a software system in a dynamic environment2001163
US 2002095650 A1Method of and system for designing an N-tier software architecture for use in generating software components—93
US 6,516,451 B1Standards-integrated design software2003107
US 6,519,763 B1Time management and task completion and prediction software2003322
US 2003106039 A1Computer-implemented system and method for project development—267
US 2003192029 A1System and method for software development—186
US 2003221184 A1Template-based application development system—170
US 2004010772 A1Interactive method and system for faciliting the development of computer software applications—103
US 2004015870 A1System and method for combinatorial test generation in a compatibility testing environment—59
US 2004093584 A1Facilitating software engineering and management in connection with a software development project according to a process that is compliant with a qualitatively measurable standard—76
US 2004143811 A1Development processes representation and management—221
US 2004255265 A1System and method for project management—99
US 2004268296 A1System and associated methods for software assembly—73
US 6,854,107 B2Method of and system for designing an N-tier software architecture for use in generating software components200586
US 2005114829 A1Facilitating the process of designing and developing a project—655

Non-Patent Literature (2)

  • Brykczynski, Bill, "A Survey of Software Inspection Checklists," ACM, Jan. 1999, p. 82-89.
  • Keil et al., "The Influence of Checklists and Roles on Software Practitioner Risk Perception and Decision-Making," IEEE, 2006, p. 1-12.