Patents
US 7,949,976 B2#65572214 Most CitedActiveUnited States (USPTO)Utility

Systematic approach for performing cell replacement in a circuit to meet timing requirements

0Forward Citations (#65572214 Global)
0.0/yrCitation Velocity (#65572214 Global)
0.56Citation PageRank (#65572214 Global)
5Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

An improved, systematic approach is provided for automatically determining which cells in a circuit should be replaced to satisfy timing adjustment requirements (TAR's), and automatically replacing the cells with replacement cells to meet the TAR's. With the improved approach, there is a high likelihood that an optimal replacement scheme will be found which requires the fewest number of cells to be replaced while still satisfying all of the TAR's.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A machine implemented method, comprising: accessing, by a computer processor, a set of information that defines a circuit, wherein the circuit comprises a signal source, a plurality of sinks, one or more cells, and a plurality of paths coupling the signal source to each of the sinks, and wherein at least a subset of the paths comprises one or more of the cells; constructing, by a computer processor, a tree structure based at least partially upon the circuit, wherein the tree structure has the signal source represented as a root, has each sink represented as a leaf node, has a branch connecting

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

Non-Patent Literature (2)

  • Kung, H.T., et al., "On finding the maxima of a set of vectors", Journal of the Associating of Computing Machinery, vol. 22, No. 4, Oct. 1975, 8 pages.
  • Kuo, Chien-Chu, et al., "Delay budgeting for a timing-closure-driven design method", International Conference on Computer Aided Design, 2000, 6 pages.