Methods and systems for employing dynamic risk-based scheduling to optimize and integrate production with a supply chain
Abstract
A production and inventory control for a manufacturing facility is provided that facilitates and coordinates improved planning and execution of such facility in a supply chain with a focus on providing an improved and robust planning, production and inventory control, even in the presence of uncertainty. This may include Optimal Planning that can balance the need for low inventory, low cost (i.e., high utilization of equipment and labor), and efficient on-time delivery. The result of such planning is not a schedule per se but a set of parameters that form a dynamic policy that generates an evolving schedule as conditions (demand, production) materialize. An Optimal Execution applies the dynamic policy resulting in a manufacturing system that is robust enough to accommodate moderate changes in demand and/or capacity without the need to reschedule. Optimal Execution may also involve a “Capacity Trigger” that detects when the assumptions regarding demand and capacity used to determine the dynamic policy are no longer valid. The Capacity Trigger also may provide a Trigger Signal to the planner indicating the need for either more or less capacity.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 17.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for applying a dynamic policy to a production control system, said system comprising: a dynamic risk-based scheduling (DRS) computer based system interoperably communicable with at least one of an enterprise resources planning (ERP) system, a manufacturing execution system (MES), and a generic manufacturing database, wherein the DRS system includes: a computer based optimal planning module that generates a dynamic policy comprising optimized parameters including optimized re-order quantities for balancing inventory levels, utilization of equipment and labor, and on-time delivery, and
- Claim 2Independent Claim
The system o
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 17 total)
References Cited — Backward Prior Art (16)
Non-Patent Literature (5)
- Edward A. Silver, David F. Pyke, Rein Peterson, "Inventory Management and Production Planning and Scheduling," pp. 280-294, Jan. 1998.
- Edward A. Silver, David F. Pyke, Rein Peterson, "Inventory Management and Production Planning and Scheduling," pp. 372-376 Jan . 1998.
- Edward A. Silver, David F. Pyke, Rein Peterson, "Inventory Management and Production Planning and Scheduling," pp. 44-67, Jan . 1998.
- Excerpts from i2 Technology, Inc., Form 10-K for FY ending Dec. 31, 1997, 8 pages.
- Factory Physics, "Small Parts, Inc. Lean Physics Implementation Proposal," Nov. 9, 2003, pp. 1-3.