Patents
US 7,940,711 B2#42715779 Most CitedActiveUnited States (USPTO)Utility

Node device and method for beacon scheduling in ad-hoc network and data transmitting method thereof

2Forward Citations (#42715779 Global)
0.1/yrCitation Velocity (#41792145 Global)
0.95Citation PageRank (#45031242 Global)
6Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

Provided are a device of a node and method for beacon scheduling in an ad-hoc network and a data transmitting method thereof, which reduce power consumptions of nodes in an ad-hoc network when data communications between the nodes occur frequently. A beacon transmitting node checks its residual power. If the residual power is lower than a predetermined level, the beacon transmitting node notifies a plan to change its beacon cycle to other nodes. Thereafter, the beacon transmitting node increases the beacon cycle and transmits a beacon at the increased beacon cycles. Consequently, the beacon transmitting node can change its beacon cycle dynamically according to its power condition. Thus, the life span of the node can be increased. Therefore, it is possible to reduce an overhead of reconstructing a sensor network.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 2.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A beacon scheduling device of a node in an ad-hoc network, comprising: a power monitor checking the residual power of the node; a beacon change notifier notifying a plan to change a beacon cycle of the node to other nodes if the checked residual power of the node is lower than a predetermined level; a beacon changer increasing the beacon cycle; and a beacon transmitter transmitting a beacon at the increased beacon cycles.

  2. Claim 2Depends on #1

    The beacon scheduling device of claim 1 , wherein the beacon scheduling device is a full-function device.

  3. Claim 3Depends on #1

    The beacon scheduling device of claim 1 , wherein the beacon changer also increases a beacon payload while increasing the beacon cycle.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗