Workload apportionment according to mean and variance
Abstract
An improved method is provided for managing workload on a multi-server computer system. In one embodiment, a subset of servers is selected according to an anticipated net workload. The remaining servers in the system may be powered off to conserve energy and prolong equipment life. Workload is dynamically apportioned among the subset of servers at selected intervals to more uniformly distribute the mean and variance of the workload among the subset of servers. More particularly, the mean and the variance for each of a plurality of workload units are equally weighed in determining a ranking of the workload units. The workload units may be ordered according to a mathematical combination of the mean and variance, such as the sum or product of mean and variance for each workload unit. The workload units are allocated among the subset of servers in according to rank, such as by assigning the workload units to the servers in a reverse round-robin fashion according to rank. Predictive power management schemes such as DVS and DVFS may then be used to control power to the servers.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 10.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of managing workload in a computer system having a plurality of servers, comprising: obtaining the workload mean and the workload variance for each of a plurality of workload units; ranking the workload units according to a mathematical combination of the mean and the variance; distributing the workload units among the servers according to their rank; and periodically repeating the steps of obtaining the workload mean and workload variance.
- Claim 2Depends on #1
The method of claim 1 , further comprising: determining the net amount of workload mean and workload variance for all of the plurality of workload units; selecting and running a subset of the servers sufficient to support the net amount of workload; and distributing the workload units among the subset of the servers.
- Claim 3Depends on #2
The method of claim 2 , further comprising selectively power
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗