Patents
US 7,921,027 B2#45267684 Most CitedActiveUnited States (USPTO)Utility

Constraint-based production planning and scheduling

2Forward Citations (#45267684 Global)
0.1/yrCitation Velocity (#41972109 Global)
0.87Citation PageRank (#49643823 Global)
16Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The present invention is a constraint-based planning tool that specifically addresses the needs of complex discrete and process industries by providing a computationally efficient method and system for fulfillment of customer orders in a supply chain. By comprehensively synchronizing and optimizing the flow of materials through the enterprise, the present invention creates a feasible plan for manufacturing operations that simultaneously optimizes both material and capacity constraints by planning and scheduling multiple customer orders, planning for use the various resources located in remote locations needed to fulfill such orders, and scheduling the used resources for replenishment at appropriate times so that the resources meet the needs of the orders.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 2.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method for deriving at least one plan for scheduling a use of at least one available human and non-human resource to satisfy one or more demands for goods or services comprising the steps of: describing an environment which models and represents the at least one available human and non-human resources and at least one alternative methodology for utilizing said at least one available human and non-human resources; describing each of said at least one available human and non-human resources and a capacity of each of said at least one available human and non-human resources

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (2 of 2 total)

References Cited — Backward Prior Art (16)

PatentTitleYearCitations
US 5,111,391 ASystem and method for making staff schedules as a function of available resources as well as employee skill level, availability and priority1992645
US 5,212,791 ADynamic scheduling1993117
US 5,233,533 AScheduling method and apparatus1993240
US 5,369,570 AMethod and system for continuous integrated resource management1994584
US 5,432,887 ANeural network system and method for factory floor scheduling1995104
US 5,596,502 AComputer system including means for decision support scheduling1997154
US 5,619,695 AMethod and apparatus for scheduling resources199789
US 5,787,000 AMethod and apparatus for scheduling work orders in a manufacturing process1998134
US 5,826,236 AMethod for allocating resources and processes for design and production plan scheduling1998234
US 5,860,067 AUser interface scheduling system with time segment creation and selection1999125
US 6,216,109 B1Iterative repair optimization with particular application to scheduling for integrated capacity and inventory planning2001220
US 6,411,922 B1Problem modeling in resource optimization200259
US 6,415,195 B1Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand200261
US 6,415,194 B1Method and system for providing sufficient availability of manufacturing resources to meet unanticipated demand200221
US 6,591,153 B2System and methods for scheduling manufacturing resources200364
US 2004128176 A1Constraint-based production planning and scheduling—43

Non-Patent Literature (5)

  • "Forward-backward algorithm," in Wikipedia, The Free Encyclopedia, retrieved 21:56, Aug. 20, 2009, from http://en.wikipedia.org/w/index.php?title=Forward-backward-algorithm&oldid=309142547, 5 pages.
  • Alvord, Charles H. III, "The S in APS", IIE Solutions, vol. 31, No. 10, Oct. 1999, 8 pages.
  • Anonymous, "Eshuis achieves total optimization of people, material, and equipment", IIE Solutions, vol. 28, No. 11, Nov. 1996, 4 pages.
  • Gartner, Betsy, "Walsh Automation's production scheduling application at Novartis wins 'Best Presentation' award at Gensym's users' society meeting", Gensym Corp., Business Wire, May 13, 1997, 3 pages.
  • International Search Report for International (PCT) Application No. PCT/US03/13723, mailed Mar. 12, 2004.