Uplink load control including individual measurements
Abstract
A technique is disclosed for determining values of different portions of a total uplink interference, which can be used for scheduling and load control at a base station, for example. A disclosed example includes obtaining measurements from individual users and using those measurements to determine corresponding portions of a total uplink interference at the base station. One portion is associated with users that are controlled by a scheduler for that base station. Another portion is associated with users that are not controlled by that scheduler. Determining each of the portions individually and using a received total wideband power measurement allows for determining each of the major portions of the total uplink interference at a base station.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 25 · Forward citations: 6.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of facilitating wireless communications, comprising: determining a first portion of an uplink interference associated with at least one first user controlled by a scheduler based upon measurements from at least the one first user that indicate a data-chip energy to total interference ratio and a traffic to pilot ratio; and determining a second portion of the uplink interference associated with at least one second user not controlled by the scheduler based upon measurements from the at least one second user that indicate a data-chip energy to total interference ratio and traffic to pil
- Claim 2Depends on #1
The method of claim 1 , comprising controlling a load at a base station associated with the scheduler based upon the determined first and second portions of the uplink interference.
- Claim 3Depends on #1
The method of claim 1 , comprising schedul
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (25)
Non-Patent Literature (5)
- International Search Report and Written Opinion of the International Searching Authority for International application No. PCT/US2007/009735 mailed Jan. 15, 2008.
- Internnational Preliminary Report on Patentability for International application No. PCT/US2007/009735, mailed Nov. 6, 2008.
- Tdoc R1-050753, HSUPA RRM related signalling, 3GPP TSG-RAN WG1 Meeting #42, London, UK, Aug. 29-Sep. 2, 2005-Nokia.
- Tdoc R1-050753, HSUPA RRM related signalling, 3GPP TSG-RAN WG1 Meeting #42, London, UK, Aug. 29-Sep. 2, 2005—Nokia.
- Tdoc R1-061045, Introduction of an E-DCH related Node B measurement for RRM purposes, 3GPP TSG RAN WG1 #44bis meeting, Athens, Greece, Mar. 27-31, 2006.