Method for reduction of control lines to operate a multi-zone completion
Abstract
A method for reducing the number of control lines needed to control a plurality of downhole devices including supplying a first control line in operable communication with a plurality of devices, the plurality of devices including at least one group of devices; supplying a second control line in operable communication with said at least one group of devices; and actuating each device of the plurality of devices in said at least one group of devices simultaneously in response to a pressure event.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 0.
Claims (3 — 2 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for reducing the number of control lines needed to control a plurality of downhole devices comprising: supplying a first control line in direct pressure communication with a plurality of devices, the plurality of devices including at least one group of devices; supplying a second control line in direct pressure communication with said at least one group of devices; and actuating each device of the plurality of devices in said at least one group of devices simultaneously in response to a pressure event.
- Claim 2Depends on #1
The method of claim 1 wherein each group includes three devices.
- Claim 3Independent Claim
A method for reducing the number of control lines needed to control a plurality of downhole devices comprising: supplying a first control line in operable communication with a plurality of devices, the plurality of devices including at least one group of devi
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (3)
Non-Patent Literature (3)
- Ole Henrik Lie, Wayne Wallace, "Intelligent Recompletion Eliminates the Need for Additional Well", Presentation at 2000 IADC/SPE Drilling conference, IADC/SPE 59210, New Orleans, Louisiana, Feb. 23-25, 2000, IADC/SPE, pp. 1-16.
- Weatherford International Ltd., "Weatherford Installs Its First four Zone Simply Intelligent (TM); Next Milestone in Continued commercialization of Hydroptic (TM) Technology", www.weatherford.com, News Releases, Feb. 24, 2003, Houston, TX, pp. 1-2.
- WellDynamics "WellDynamics Contracted for Brunei Installations", www.rigzone.com, Jul. 23, 2003. p. 1-1.