Method and apparatus for scheduling test vectors in a multiple core integrated circuit
Abstract
A computer implemented method, apparatus and computer program product for extending test coverage in a simulated multiple core integrated circuit. The simulator applies at a first time a first test vector on the simulated multiple core integrated circuit, the first test vector having a duration. The simulator may also apply a second test vector at a second time before the duration but substantially after the first time. The simulator can collect a response from the multiple core integrated circuit based on the first test vector and the second test vector.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 2.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A computer implemented method for extending test coverage in a simulated multiple core integrated circuit comprising: applying at a first time a first test vector on the simulated multiple core integrated circuit, the first test vector having a duration; applying a second test vector at a second time before the duration but substantially after the first time, wherein substantially after the first time comprises a delay interval of starting a second test vector at at least 10 percent of the duration of the first test vector; and collecting a response from the multiple core integrated circuit ba
- Claim 2Depends on #1
The computer implemented method of claim 1 , further comprising: comparing the response to an expected response to form a comparison.
- Claim 3Depends on #2
The computer implemented method of claim 2 , fur
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (2)
- "A Reconfigurable Power-Conscience Core Wrapper and its Application to SOC Test Scheduling", Eric Larsson and Zebo Peng, Embedded Systems Laboratory. Linkopings Universitet, Sweden. ITC International Test Conference, 2003.
- "Between-Core Vector Overlapping for Test Cost Reduction in Core Testing", Tsuyoshi Shinogi, 12th Asian Test Symposium (ATS '03). Nov. 16-19, 2003.