Operating time reducing method, operating time reducing apparatus, program and component mounter
Abstract
An operating time reducing method in which a processing procedure of a component mounting order determination method can be changed depending on the type of an operation loss that affects a component mounting time for mounting components onto the board is an operating time reducing method for a component mounter, wherein the method includes: an operation loss identifying step of identifying an operation loss to be resolved in the component mounter; a processing procedure selecting step of selecting, based on the identified operation loss, a processing procedure for reducing an operating time of the component mounter; and a processing procedure executing step of executing the selected processing procedure.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 21.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
An operating time reducing method for a component mounter, the method comprising: an operation loss identifying step of identifying an operation loss to be resolved in the component mounter; a processing procedure selecting step of selecting, based on the identified operation loss, a processing procedure for reducing an operating time of the component mounter; and a processing procedure executing step of executing the selected processing procedure, wherein the component mounter is provided with a rotary head which, while rotating about an axis, picks up components and mounts the components ont
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 21 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (1)
- Partial English translation of Japanese Patent Application No. 2004-6605, which was cited in the IDS filed Oct. 9, 2008.