Methods of perforation using viscoelastic surfactant fluids and associated compositions
Abstract
The invention provides a method for perforating a well with a perforating fluid comprising a viscoelastic surfactant that essentially stops fluid leak-off after perforation in an overbalanced condition. Another aspect of the invention provides the perforating fluid in itself. The well has a wellbore defined by a generally cylindrical casing in at least a portion of the wellbore (i.e., the wellbore is cased, although it is not necessary cased in its entire length). The wellbore passes through a subterranean formation that comprises hydrocarbon formation fluids (such as oil and/or gas), at least in certain strata. The method comprises placing a perforating device in a wellbore which includes at least one explosive perforating charge that can be detonated in order to perforate the casing and allow the formation fluids to enter the wellbore. The casing is located between the subterranean formation and the perforating device. A perforating fluid including at least one viscoelastic surfactant is placed in the wellbore between the perforating device and the casing, in at least a portion of the wellbore. In other words, the perforating fluid is present in the wellbore adjacent to the perfo
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 30 · Forward citations: 3.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for perforating a well made of a wellbore in a formation comprising the steps of: a. placing a perforating device comprising at least one explosive perforating charge in the wellbore; b. placing a perforating fluid comprising at least one viscoelastic surfactant in the wellbore between the perforating device and the formation; c. detonating the perforating device and allowing formation fluids to enter the wellbore; wherein as a result of the detonation, communication is established between the wellbore and the formation, and at least a portion of the perforating fluid is put in commun
- Claim 2Depends on #1
The method according to claim 1 , wherein the wellbore further comprises a casing in at least a port
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗