Holding unit having delayed conveyance time
Abstract
A finisher includes: a holding unit; a stapling unit; a discharge unit; and a control unit. The finisher forms a part of a second sheet bundle subsequent to a first sheet bundle until discharging the first sheet bundle. The holding unit receives a sheet of the first sheet bundle and the subsequent sheet within a first period. The holding unit receives the last sheet of the first sheet bundle and a first sheet of the second sheet bundle within a second period as same length as the first period. The holding unit receives a sheet of the second sheet bundle and the subsequent sheet within a third period different from the second period in time length.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A finisher comprising: a conveying unit configured to receive a plurality of sheets provided from outside of the finisher and convey the plurality of sheets; a holding unit configured to sequentially collect the plurality of sheets conveyed by the conveying unit to form a first sheet bundle; a support unit configured to receive the first sheet bundle; a stapling unit configured to staple the first sheet bundle on the support unit; a discharge unit configured to discharge the first sheet bundle stapled by the stapling unit from the support unit; and a control unit configured: to control the hol
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗