Method and apparatus for monitoring and responding to land use activities
Abstract
The invention provides a method and apparatus for monitoring the use of land. More specifically, the invention monitors the use of land at a specified site, as well as at adjacent sites. The invention answers the question of how to manage risks resulting from external activities and how to intervene proactively.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 10.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer implemented apparatus for monitoring use of land, comprising: a computer executable logic module configured to identify a site to be monitored in connection with one or more zones, wherein said site comprises a specific geographic area, and wherein boundaries of said site do not necessarily align with boundaries of a legal description of a property; said logic module further configured to regularly monitor ongoing land use activities in connection with said site in view of at least one land use restriction which limits how said site can be used; said logic module further configured
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (10 of 10 total)
References Cited — Backward Prior Art (2)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 6,401,027 B1 | Remote road traffic data collection and intelligent vehicle highway system | 2002 | 454 |
| US 6,606,304 B1 | System for real-time monitor and response | 2003 | 81 |
Non-Patent Literature (4)
- "India: Call for Appropriate Data Bases for Land Use"; Jun. 2,1997; The Hindu.
- Edwards, Amy L.; "The Sleeping Giant Awakes: The Growing Public Debate About Institutional Controls"; Jan. 2001; American Bar Association's Environmental Transactions, Audits and Brownsfields Committee NewSLetter.
- Int'l Search Report and Written Opinion mailed Apr. 15, 2008 in PCT application PCT/US05/258480, 10 pages.
- Non-Regulated Industry focus Group; US Environmental Protection Agency Institutional Controls Tracking System; Oct. 8, 2002; http://www.epa.gov/superfund/policy/ic/work/fisum.pdf.