Patents
US 7,865,388 B2#10103351 Most CitedActiveUnited States (USPTO)Utility

Apparatus and method for providing program protection engineering, security management, and report preparation for sensitive and classified projects

10Forward Citations (#10103351 Global)
0.7/yrCitation Velocity (#11288846 Global)
2.59Citation PageRank (#9600811 Global)
6Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

An apparatus and method using a program protection engineering (P2E) toolkit to provide program protection engineering, security management, and report preparation for sensitive and classified projects. The P2E toolkit is an implementation of security policies, procedures, and methodologies associated with acquisition programs. Acquisition programs may range from large-scale classified systems for the government to sensitive corporate acquisition programs focusing on company proprietary or intellectual property issues. Specifically, the P2E toolkit provides end-to-end program protection engineering, security management, and report preparation for sensitive and classified programs throughout the program lifecycle, and assists security professionals and program managers to make appropriate decisions to protect their acquisition programs from compromise due to foreign intelligence threats or corporate/industrial espionage. The P2E toolkit enhances the traditional program management concerns of technical performance, schedule, and cost, by adding lifecycle protection as in integral component.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 10.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    An apparatus for providing program protection engineering, security management, and report preparation for sensitive and classified projects, comprising: A processor; A program protection engineering (P2E) toolkit configured to: log into a program protection engineering (P2E) toolkit; specify an acquisition program, wherein the acquisition program includes technical components, system components, and programmatic components; copy variables from a master database to a program specific database, wherein the variables include timeline phase groups, phases, milestones, protection activities for th

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (3)

  • Institute of Electrical and Electronic Engineers. "Software Engineering: Software Life-Cycle Processes, Risk Management." Proposed Standard. New York: IEEE, 2004 http://standards.ieee.org/announcements/pr-p1540.html.
  • Institute of Electrical and Electronic Engineers. "Software Engineering: Software Life-Cycle Processes, Risk Management." Proposed Standard. New York: IEEE, 2004 http://standards.ieee.org/announcements/pr—p1540.html.
  • Project Management Institute. A Guide to the Project Management Body of Knowledge (PMBOK Guide). Newton Square, PA: Project Management Institute, 1996 www.pmibookstore.org/productdetail.asp?productid= 4106.