Patents
US 7,855,871 B2#6820428 Most CitedActiveUnited States (USPTO)Utility

Generator ready load center

14Forward Citations (#6820428 Global)
0.9/yrCitation Velocity (#8172546 Global)
2.89Citation PageRank (#8067040 Global)
32Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The present invention relates generally to a load center. More particularly, the invention encompasses a generator ready load center (GRLC). The present invention is also directed to a novel generator ready load center (GRLC) that operates as a standard load center but is ready to accommodate an automatic transfer switch (ATS) for a standby generator, or a manual transfer switch (MTS) for a portable generator. Further the generator ready load center provides an automatic and manual transfer between primary and secondary power sources. The generator ready load center solves the problem of dangerous back-feeding between the primary power source and the secondary power source.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 32 · Forward citations: 14.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A generator ready load center, comprising: an enclosure having at least one base pan, a first interior bus structure containing a first set of bus bars secured to a first area of said base pan and connected to a utility power source, a second interior bus structure containing a second set of bus bars secured to a second area of said base pan, a first non-automatic switch coupled to the first interior bus structure, a subfeed circuit breaker coupled to the second interior bus structure, an electrical connection connecting the first non-automatic switch and the subfeed circuit breaker, a second

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (1)

  • Siemens News and Press (online), Feb. 28, 2008. Retrieved from the internet URL: http://www.sea.siemens.com/us/news/consturction/pages/siemens-new-residential-generator-ready-load-center-is-now-available.aspx> retrieved on Jan. 22, 2010, the whole document; Others.