System, method, and computer program product for creating a production plan
Abstract
In a build-to-order (BTO) management system, domestic production orders are incorporated into a production plan before overseas production orders. When incorporating the production orders into the production plan, an ideal number of products is set for various equalizing factors, and several kinds of the production plans are made on the basis of an achievement ratio of the number of products for the equalizing factors actually incorporated into the production plan to the ideal production number of products and the dates of receiving the production orders. The resulting production plans are compared to choose an optimal production plan.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 32 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for creating a production plan for built-to-order products comprising: providing a first order information storage database for storing data of a first production order information group, providing a second order information storage database for storing data of a second production order information group for which an appointed term of delivery is longer than an appointed term of delivery for the first production order information group, and storing at least one equalizing factor with order information of the first and second order information storage databases and being a factor affec
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗