Patents
US 7,802,636 B2#631375 Most CitedActiveUnited States (USPTO)Utility

Simultaneous tubular handling system and method

62Forward Citations (#631375 Global)
3.9/yrCitation Velocity (#506924 Global)
4.20Citation PageRank (#4392172 Global)
50Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A system and method for building and handling oilfield tubular stands while drilling operations are simultaneously and independently occurring with one drilling deck, one derrick, and one rotary system. An offline guided path horizontal to vertical arm lifts and moves in the same plane tubulars stored horizontally on the catwalk and positions the tubulars vertically directly into a preparation hole for assembling and disassembling tubular stands while online drilling operations are simultaneously being conducted. A stand arm lifts and lowers the tubulars into and out of the adjustable preparation hole, and transports the tubulars for storage to an auxiliary tubular racking station in the upper part of the derrick. A bridge racker crane moves tubular stands from the auxiliary tubular racking station to the top drive or another tubular racking station.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 62.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A system for drilling, said system comprising: a drilling deck having a well center; a drilling structure disposed with said drilling deck; a primary tubular advancing station disposed with said drilling structure for advancing a first tubular to said well center; an auxiliary tubular handling station comprising a stand arm for connecting a second tubular with a third tubular while said second tubular is in a substantially vertical position; and a guided path arm positioned adjacent to said auxiliary tubular handling station to guide the second tubular to said auxiliary tubular handling statio

  2. Claim 2Depends on #1

    The system of claim 1 , further comprising: a first tubular racking station positioned above said primary tubular advancing s

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗