Radial spring latch apparatus and methods for making and using same
Abstract
New locking connector assemblies and telescoping extension/retraction assemblies are disclosed that operate on the natural spring rate constraints of radial protrusions or radially constrained rings as they interact with engaging members to provide the locking force and permit the connector and extension retraction assemblies to be engage and disengaged or extended and retracted.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 1.
Claims (1)
- Claim 1Independent Claim
An extension/retraction apparatus for subterranean use on a tubular string comprising: a housing forming a part of the tubular string; a first member including a first connector disposed at a proximal end portion of the first member and having a rigidly mounted cantilevered detent engaging element disposed radially on an outer surface of the first connector near the proximal end of the first member; and a second member including a second connector disposed at a distal end portion of the second member and having a plurality of detents disposed on an inner surface thereof, said second member in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2012305319 A1 | Safety joint with indicating feature | — | 0 |
References Cited — Backward Prior Art (27)
Non-Patent Literature (5)
- Garfield, G., et al., "Novel Completion Technology Eliminates Formation Damage and Reduces Rig Time in Sand Control Applications", SPE 93518, Mar. 2005, 1-5.
- Garfield, G.L., et al., "Technology Development and Field Testing on North Slope Leads to Improved Reliability of the One-Trip Sand-Control Completion System", May 2006, SPE 100424, May 2006, 1-10.
- Garfiled, G., "New One-Trip Sand-Control Completion System That Eliminates Formation Damage Resulting from Conventional Perforating and Gravel-Packing Operations", SPE 96660, Oct. 2005, 1-5.
- Garfiled, G., "One-Trip Sand Control-Completion Technology That Eliminates Perforation Damage While Reducing Rig Time", SPE 93926, 2005, 1-5.
- Garfiled, Garry, et al., "Novel completion Technology Eliminates Formation Damage and Reduces Rig Time in Sand Control Applications", SPE/IADC 92596, Feb. 2005, 1-6.