Method for running tubulars in wellbores
Abstract
Methods for installing tubulars into a highly deviated wellbore may include a) drilling the well to the planned total depth of the interval, b) placing a first fluid into the wellbore below a prescribed measured depth in the high-angle portion of the wellbore, c) placing a second fluid into the wellbore above the prescribed measured depth, d) plugging the distal port ion of the tubular with a lower plug and an upper plug, e) as the tubular is run into the wellbore, placing a lightweight fluid into the plugged section of tubular and a heavy fluid above the plugged section of tubular, and f) running the tubular into the wellbore to the planned total depth. The first fluid has a density that causes the portion of the tubular that extends into the first fluid to become substantially neutrally buoyant, and the second fluid has a density less than the first fluid.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 14.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for inserting a tubular into a wellbore, the method comprising: a) selecting an external tubular running fluid having a density that reduces drag acting on a tubular to be run into at least one deviated portion of the wellbore, wherein the density of the external tubular running fluid is selected so that the tubular is locally substantially neutrally buoyant in at least part of the at least one deviated portion of the wellbore, b) placing the external tubular running fluid into the at least a part of the at least one deviated portion of the wellbore, c) placing a second fluid into the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (14 of 14 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (3)
- C. J. Mason et al., "Casing Running Challenges for Extended-Reach Wells", SPE 84447, SPE Annual Technical Conference, Oct. 5-8, 2003, 8 pages, Denver, Co.
- European Search Report No. 112485, dated Aug. 25, 2005, 5 pages.
- G. Rae et al., "A New Approach for Running Production Casing from Semi-Submersible Rigs on Highly Deviated Wells", SPE/IADC 79814, SPE/IADC Drilling Conference, Feb. 19-21, 2003, 13 pages, Amsterdam, The Netherlands.