Retrievable frac mandrel and well control stack to facilitate well completion, re-completion or workover and method of use
Abstract
A retrievable frac mandrel and a well control stack are used to efficiently accomplish well completion, re-completion or workover. The retrievable frac mandrel is inserted in a tubing head spool of a well to be completed, re-completed or re-worked. The well control stack is mounted to a top of the tubing head spool and seals off against a top of the retrievable frac mandrel. Once well completion, re-completion or workover is completed, the frac mandrel can be retrieved from the tubing head spool without killing or plugging the well.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 44 · Forward citations: 9.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A retrievable frac mandrel and well control stack for facilitating completion, re-completion or workover of a cased well having a wellhead with a tubing head spool, comprising: the frac mandrel having a top end and a bottom end that are separate pieces interconnected by a threaded connection with a fluid seal to prevent a migration of stimulation fluids between the separate pieces, the bottom end being contoured to be received in the tubing head spool and to be locked in the tubing head spool by tubing head spool lock down screws that engage an annular groove in the bottom end, and to further
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗