Method and computer program product for evaluating a project

4Forward Citations (#24406082 Global)
0.2/yrCitation Velocity (#28421275 Global)
1.43Citation PageRank (#24583996 Global)
5Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and computer program product, for evaluating a project, the method includes: receiving task timing information and task relationship information; locating at least one hidden critical path; and estimating a robustness of the project in response to at one characteristic of the at least one hidden critical path.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 4.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer program product for evaluating a project that comprises a non-transitory computer usable medium with a computer readable program thereon, wherein the computer readable program when executed on a computer causes the computer to: receive task timing information and task relationship information; locate at least one hidden critical path wherein the locating of the at least one hidden path comprises ignoring paths that are characterized by a path duration slack that is smaller than a path duration slack threshold; estimate a robustness of the project in response to at least one characte

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Chen, Shyi-Ming and Chang, Tao-Hsing, "Finding Multiple Possible Critical Paths using Fuzzy PERT", IEEE Transactions on Systems, Man, & Cybernetics, Part B: Cybernetics. vol. 31, No. 6, Dec. 2001. pp. 930-937.
  • Dodin Bajis, "Determining the Top K-Critical Paths in PERT Networks", Operations Research, vol. 32, No. 4, Jul.-Aug. 1984. pp. 859-877.
  • Dodin, Bajis M. and Elmaghraby, Salah E., "Approximating the Criticality Indices of the Activities in PERT Networks", Management Science. vol. 31, No. 2, Feb. 1985, pp. 207-223.
  • Genaro J Gutierrez, Anand Paul. Robustness to variability in project networks. IIE Transactions [serial online]. 2001;33:649-660. Available from: ABI/INFORM Global. Accessed Aug. 25, 2009, Document ID: 75362496.
  • Goodpasture, John C.; Quantitative Methods in Project Management; J.Ross Publishing, 2003, ISBN 1932159150.