Packer system and method
Abstract
Disclosed herein is a packer system. The packer system includes, a first packing element settable to create a seal against a downhole structure, and a contingency packing element in operable communication with the first packing element, maintainable in reserve and settable at a time after which the first packing element is set.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 9.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A packer system comprising: a first packing element settable to create a seal against a downhole structure; a contingency packing element in operable communication with the first packing element, maintainable in reserve and settable through deformation of a deformable portion at a time after which the first packing element is set; and a protector in operable communication with the contingency packing element configured to protect at least the deformable portion of the contingency packing element from a downhole environment prior to deformation thereof.
- Claim 2Depends on #1
The packer system as claimed in claim 1 wherein the first packing element is elastomeric.
- Claim 3Depends on #1
The packer system as claimed in claim 1 wherein the first packing element is metal.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (9 of 9 total)
References Cited — Backward Prior Art (15)
Non-Patent Literature (4)
- Horn, Mark, et al. "Otter: The World's Longest Subsea Tie-Back with Dual ESP," OTC 15369, Houston, Texas, May 5-8, 2003.
- International Search Report with Written Opinion, PCT/US2008/050257, Date Mailed, Apr. 23, 2008.
- Kothari, Kiran M., et al. Sealing Large-Diameter Cast-Iron Pipe Joints Under Live Conditions, Final report, Gas Technology Institute, DE-FC22-02NT41316, Dec. 2005.
- SAND79-7125, Program for the Improvement of Downhole Drilling-Motor Bearings and Seals, Sandia Laboratories,, Phase III, Part 2: Final Report, Terra Tek, Salt Lake City, Utah, Mar. 1980.