System and method for billing a construction activity for a telecommunications company
Abstract
An exemplary method and system for administering a construction activity for a telecommunications company can include designing the activity, transmitting the activity to a second datastore, and communicating the one or more tasks. The first datastore may include an inventory of at least one of one or more tasks and inventory items and the second datastore may provide a communication interface for a first entity managing the activity and a second entity completing the one or more tasks to accomplish the activity at a construction site, where the one or more tasks can be communicated to the second entity. Moreover, the second entity can create a change in plan and communicate the change in plan to the second datastore, which in turn communicates the change in plan to the first datastore. Generally, once the change in plan is approved, a task is completed for the activity. The second entity can communicate the completed task directly to the second datastore, which in turn may populate the first datastore inventory with the completed task.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for billing a construction activity for a telecommunications company, comprising: designing a telecommunications construction activity in a first electronic datastore wherein the first electronic datastore comprises one or more tasks and any inventory items to be installed or used in the completion of those tasks; transmitting the telecommunications construction activity to a second electronic datastore that provides a communication interface for a first entity managing the activity and a second entity completing the one or more tasks to accomplish the activity at a construction site,
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (6)
Non-Patent Literature (5)
- "Construction Accounting Software Review-2004" CPA Technology Advisor, Apr.-May 2004.
- "GCPay Help Text," www.gcpay.com, Nov. 14, 2005.
- "Microsoft Office Project 2003 Inside Out" Teresa Stover, Microsoft Press (Introductory Material, Chapter 9, Chapter 30), Oct. 2003. (78 pages).
- "Primavera Project Planner®, Planning and Control Guide, Version 3.0" Primavera Systems, Inc., 1999. (300 pages).
- "ToolboxSoftware.com" CPA Technology Advisor, Apr.-May 2005.