Tower made of prestressed concrete prefabricated assembly units
Abstract
The invention concerns a method of erecting a pylon of prestressed concrete finished parts and an apparatus for advantageously carrying out the method. In order to at least reduce the problems present in the state of the art when erecting a pylon, there is provided a funnel-shaped apparatus 8 for guiding a tensioning wire, the smaller cross-section 11 thereof being substantially the same as that of the jacket tube 7 . There is further provided a seal 20 for producing a pressure-tight transition between two mutually superposed segments 4, 6 , wherein the height of the seal 20 substantially corresponds to the intended spacing of the segments. Also provided is a prestressed concrete finished part 4, 6 in which the apparatus 8 according to the invention is integrated. Finally there is provided a method in which epoxy resin is used as a composite joining material 34 between two segments.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 46 · Forward citations: 19.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A sealing arrangement comprising: a first tower segment; a second tower segment superposed with respect to the first tower segment along a longitudinal axis; a seal longitudinally interposed between the first and second tower segments to seal a space therebetween, the seal including: a central seal axis, a lower end region sealingly coupled adjacent an upper region of the first tower segment and an upper end region sealingly coupled adjacent a lower region of the second tower segment, a round cross-section with respect to the central seal axis, an inner wall having an internal width and an out
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗