Coordination of calendar searches in a network scheduler
Abstract
A system that indicates which frame should next be removed by a scheduler from flow queues within a network device, such as a router, network processor, and like devices, is disclosed. The system includes a search engine that searches a set of calendars under the control of a Finite State Machine (FSM), a current pointer and input signals from array and a clock line providing current time. The results of the search are loaded into a Winner Valid array and a Winner Location array. A final decision logic circuit parses information in the Winner Valid array and Winner Location array to generate a final Winner Valid Signal, the identity of the winning calendar and the winning location. Winning is used to define the status of the calendar in the calendar status array selected as a result of a search process being executed on a plurality of calendars in the calendar status array.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system, comprising: a calendar search engine; an array of calendars with outputs operatively coupled to inputs of the search engine, wherein the array of calendars includes a first set of time based calendars in which a search zone over which the search engine searches is delineated by a Current Pointer (CP) and a Current Time (CT) and a second set of non-time based calendars which uses the CP to delineate the beginning of a search zone; a Winner Valid array operatively coupled to the calendar search engine; a Winning Location array operatively coupled to the calendar search engine; and a co
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗