Methods of initiating intersecting fractures using explosive and cryogenic means
Abstract
Methods and systems that utilize explosive and cryogenic means to establish fluid communication to areas away from the well bore walls are disclosed. A first fracture is induced in the subterranean formation. The first fracture is initiated at about a fracturing location and the initiation of the first fracture is characterized by a first orientation line. The first fracture temporarily alters a stress field in the subterranean formation. Explosives are then used to induce a second fracture in the subterranean formation. The second fracture is initiated at about the fracturing location and the initiation of the second fracture is characterized by a second orientation line. The first orientation line and the second orientation line have an angular disposition to each other.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 16.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for fracturing a subterranean formation, wherein the subterranean formation comprises a well bore having an axis, the method comprising: inducing a first fracture in the subterranean formation, wherein: the first fracture is initiated at about a fracturing location, the initiation of the first fracture is characterized by a first orientation line, wherein a direction of the first orientation line is determined by a natural stress field in the subterranean formation; the first fracture temporarily alters the natural stress field in the subterranean formation; and using explosives to in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 16 total)
References Cited — Backward Prior Art (27)
Non-Patent Literature (5)
- SPE 103774, "Consideration for Future Stimulation Options Is Vital in Deciding Horizontal Well Drilling and Completion Schemes for Production Optimization", 2006.
- Surjaatmadja, "Single Point of Initiation, Dual-Fracture Placement for Maximizing Well Production," Society of petroleum Engineers, SPE 107718, 2007.
- Surjaatmadja, "The Important Second Fracture and Its Operational Placement for Maximizing Production," Society of Petroleum Engineers, SPE 107059, 2007.
- Surjaatmadja, "The Mythical Second Fracture and Its Operational Placement for Maximizing Production," Society of Petroleum Engineers, SPE 106046, 2007.
- Warpinski, Norman R. and Branagan, Paul T., "Altered Stress Fracturing", JPT (Sep. 1989), 990-97, 473-476, SPE 17533.