Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability

1Forward Citations (#60133178 Global)
0.1/yrCitation Velocity (#52947387 Global)
0.76Citation PageRank (#60133178 Global)
32Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Individual employees are permitted to be individuals and plan their work as individuals. Individuals are only asked to plan their work within a limited tasking horizon. Employees track their progress using verbs that are designed to capture the reasons behind positive and negative predictive ability. Verbs are analyzed and expected predictive error, also know as risk, is calculated. Once verbs are captured they can be analyzed for ways to improve predictive ability. In addition, the risk can be factored into the initial planning stage so as to include an expected predictive error in the initial planning.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 32 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computerized method for modeling multiple tasks for multiple users, the computerized method using at least one processor apparatus to carry out the method comprising the steps of: breaking a language into component parts, including at least verbs, and objects; creating at least one tasking horizon; combining the component parts to create at least one language combination, said at least one combination including verbs and objects, which are stored on a computer-readable storage medium along with at least one task; said method of modeling further comprising: receiving at least one task for the

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (32)

PatentTitleYearCitations
US 4,942,527 AComputerized management system199055
US 5,016,170 ATask management1991182
US 5,111,391 ASystem and method for making staff schedules as a function of available resources as well as employee skill level, availability and priority1992645
US 5,255,181 AMethod of planning organizational activities1993195
JP H06124285 AEvent driving type project management simulator—7
US 5,321,610 AIntegrated product for implementing application software and process of developing integrated product for implementing application software199490
US 5,406,476 AMethod and apparatus for resource constraint scheduling1995122
US 5,467,268 AMethod for resource assignment and scheduling1995391
US 5,530,861 AProcess enaction and tool integration via a task oriented paradigm1996593
US 5,671,361 APriority rule search technique for resource constrained project scheduling1997160
US 5,671,360 AProject management tool implementing authority for a people oriented work environment tool1997115
US 5,692,125 ASystem and method for scheduling linked events with fixed and dynamic conditions1997389
US 5,760,770 ASystem and method for defining a view to display data1998168
US 5,765,139 AMethod and apparatus for transforming a resource planning data structure into a scheduling data structure199887
US 5,765,140 ADynamic project management system1998394
US 5,767,848 ADevelopment support system1998138
US 5,798,950 AMethod and apparatus for estimating durations of activities in forming a current system, based on past durations of activities in forming past systems199847
JP H10240827 ASystem for supporting project management—10
US 5,818,715 AMethod and system for efficiently modifying a project model in response to an update to the project model199842
US 5,836,011 AImplementation of teams and roles within a people oriented work environment199860
US 5,848,394 AMethod and system for producing a work breakdown structure for a project1998119
US 5,855,006 APersonal activity scheduling apparatus1998469
WO 9,904,370 A1Multi-media project management and control system—24
US 5,893,074 ANetwork based task management1999194
US 5,923,552 ASystems and methods for facilitating the exchange of information between separate business entities1999122
US 6,014,633 AMethod for the analysis and standardization of bills of resources200079
US 6,023,572 AComputer based system and method for modeling activities of people in an organization200081
US 6,047,260 AIntelligent planning and calendaring system with cueing feature and floating tasks2000280
US 6,101,481 ATask management system2000282

Non-Patent Literature (5)

  • A software project dynamics model for process cost, schedule and risk assessment RJ Madachy-1994-sunset.usc.edu.
  • AbouRizk et al. "Construction Simulation and Distribution Fitting in a Data Deficient Enviroment", Uncertainty Modeling and Analysis, 1993, Proceedings, Second International Symposium on College Park, MD, USA, Apr. 25-28, 1993, Los Alamitos, Ca, USA, IEEE Computers Soc., Apr. 25, 1993, pp. 493-499.
  • AbouRizk, et al.; "Construction Simulation and Distribution Fitting in a Data Deficient Environment", (C) 1993 IEEE, pp. 493-499.
  • Attaran, Mohsen; "The coming age of fuzzy logic in manufacturing & services", Mar.-Apr. 1996, Journal of Systems Management, v47, n2, p4(9), Dialog 08695294 18304943.
  • Barki, Henri; Rivard, Suzanne; Talbot, Jean; "Toward an assessment of software development risk", Fall 1993, Journal of Management Information Systems, v10n2, pp. 203-225. Dialog 00813256 94-62648.