Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability
Abstract
Individual employees are permitted to be individuals and plan their work as individuals. Individuals are only asked to plan their work within a limited tasking horizon. Employees track their progress using verbs that are designed to capture the reasons behind positive and negative predictive ability. Verbs are analyzed and expected predictive error, also know as risk, is calculated. Once verbs are captured they can be analyzed for ways to improve predictive ability. In addition, the risk can be factored into the initial planning stage so as to include an expected predictive error in the initial planning.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 32 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computerized method for modeling multiple tasks for multiple users, the computerized method using at least one processor apparatus to carry out the method comprising the steps of: breaking a language into component parts, including at least verbs, and objects; creating at least one tasking horizon; combining the component parts to create at least one language combination, said at least one combination including verbs and objects, which are stored on a computer-readable storage medium along with at least one task; said method of modeling further comprising: receiving at least one task for the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2020074367 A1 | Computer System and Method for Predicting Risk Level of Punch Items | — | 0 |
References Cited — Backward Prior Art (32)
Non-Patent Literature (5)
- A software project dynamics model for process cost, schedule and risk assessment RJ Madachy-1994-sunset.usc.edu.
- AbouRizk et al. "Construction Simulation and Distribution Fitting in a Data Deficient Enviroment", Uncertainty Modeling and Analysis, 1993, Proceedings, Second International Symposium on College Park, MD, USA, Apr. 25-28, 1993, Los Alamitos, Ca, USA, IEEE Computers Soc., Apr. 25, 1993, pp. 493-499.
- AbouRizk, et al.; "Construction Simulation and Distribution Fitting in a Data Deficient Environment", (C) 1993 IEEE, pp. 493-499.
- Attaran, Mohsen; "The coming age of fuzzy logic in manufacturing & services", Mar.-Apr. 1996, Journal of Systems Management, v47, n2, p4(9), Dialog 08695294 18304943.
- Barki, Henri; Rivard, Suzanne; Talbot, Jean; "Toward an assessment of software development risk", Fall 1993, Journal of Management Information Systems, v10n2, pp. 203-225. Dialog 00813256 94-62648.