System and method for lot priority adjustment
Abstract
A system and method for lot priority adjustment. The system includes a database, a calculation unit and an adjustment unit. The database stores at least a committed date for a lot, a throughput rate and a cycle time for respective route operations in a production line, and Work-In-Process (WIP) information of the production line. The calculation unit calculates an x-ratio for the lot on a target route operation according to a current time, the committed date and a remaining cycle time for the lot, calculates a lot weight for the lot according to current loading of a predetermined number of route operations subsequent to the target route operation, and calculates a weighted x-ratio according to the x-ratio and the lot weight. The adjustment unit adjusts a priority for the lot according to the weighted x-ratio.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer-implemented method for lot priority adjustment for use in a computer including a calculation unit, and an adjustment unit, wherein the computer is programmed to perform the steps of: receiving a throughput rate and a cycle time for respective route operations in a production line, and Work-In-Process (WIP) information of the production line from the production line by the calculating unit; calculating an x-ratio for a lot on a target route operation according to a current time, a committed date and a remaining cycle time for the lot by the calculating unit; calculating a lot weight
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 9,507,341 B2 | Sibling lot processing | 2016 | 0 |
References Cited — Backward Prior Art (8)
Non-Patent Literature (3)
- Dabbas, R., Chen, H., et al., A Combined Dispatching Criteria Approach to Scheduling Semiconductor Manufacturing Systems, New York: Apr. 2001. Computers & Industrial Engineering. vol. 39, Iss. 3,4; p. 307.
- Dabbas, R., Fowler, J., A new scheduling approach using combined dispatching criteria in wafer fabs, (2003) IEEE Transactions on Semiconductor Manufacturing, 16(3), 501-510.
- Kim, Y-D, Kim, J-U, et al., Due-Date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility, Feb. 1998, IEEE Transactions on Semiconductor Manufacturing, vol. 11, No. 1, pp. 155-164.