Inspection scaffold of large component for boiler and building method thereof
Abstract
A scaffold assembling of a large component for a boiler requiring inspection is not performed by a high-place work but assembled safely and in a short time. The scaffold is assembled to the large component for the boiler supported by a component supporting beam at the ground side before it is attached to a steel frame main-beam 16 . Scaffold lifting/supporting beams interposing coil spaces of a superheater 14 are suspended on wires 36 lifted down from spaces of a ceiling tube wall 34 being a horizontal member of the superheater 14 . The scaffold lifting/supporting beams 32 are lifted to raise little by lithe within the superheater, and scaffold components are assembled sequentially toward downward. After a required number of steps of scaffolds are assembled, the scaffold lifting/supporting beams 32 are coupled to the ceiling tube wall 34 to be supported. Finally, the superheater 14 is raised by a lifting means to install to the main-beam.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A building method of assembling an inspection scaffold and a large component for a boiler, the inspection scaffold having a plurality of scaffold supporting beams and a plurality of scaffold components, comprising: simultaneously assembling the inspection scaffold with the large component at a ground surface, simultaneously assembling at the ground surface comprising: (a) assembling the plurality of scaffold supporting beams to a plurality of wires suspended from a wire attaching fixture, the plurality of scaffold supporting beams being assembled between spaces of the large component while the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗