Predicting parts needed for an onsite repair using expected waste derived from repair history
Abstract
A method for predicting parts for onsite repair which takes into account a repair history and the costs associated with mis-predictions. Parts for onsite repair of a product are predicted by determining an expected waste for one or more parts of the product. The parts having a lowest expected waste are selected and sent to the onsite repair. The expected waste indicates parts that are responsible for high support costs and highlights the mistakes being made and scores the mistakes by actual cost.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 22 · Forward citations: 10.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A method executed by a computer, comprising: determining, by the computer, costs of mis-predicting parts that may be replaced during an onsite repair of a product in response to a repair history, wherein the costs are computed based on probabilities of over-predicting and under-predicting the parts; selecting, by the computer, a subset of the parts to be sent to the onsite repair in response to the costs; and selecting, by the computer, another subset of the parts for training of call qualifiers in response to the costs.
- Claim 2Independent Claim
A method executed by a computer, comprising: determining, by the computer, costs of mis-predicting parts that may be replaced during an onsite repair of a product in response to a repair history, wherein the costs are computed based on probabilities of over-predicting and under-predicting the parts; selecting, by the computer, a subset
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (10 of 10 total)
References Cited — Backward Prior Art (22)
Non-Patent Literature (5)
- Albright, Brian, The just-in-case supply chain Frontline Solutions, vol. 2, No. 10, Sep. 2001.
- Ashayeri, J et al., Inventory Management of Repairable Service Parts for Personal Computers International Journal of Operations & Production Management, vol. 16, No. 12, 1996.
- Beck, Jeff, Statistical process control and selectable forecast calendars reduce GE aircraft engines' parts inventory , Product and Inventory Management Journal, Third Quarter 1999, vol. 40, No. 3, pp. 62-66.
- Botter, Rene et al., Stocking Strategy for service parts-a case study International Journal of Operations & Production Management, 2000, vol. 20, No. 6, p. 656.
- Cohen, Morris et al., Identifying Opportunities for Improving Teradyne's Service-Parts Logistics System Interfaces, Jul./Aug. 1999, vol. 29, No. 4, pp. 1-18.