Patents
US 7,706,980 B2#2431295 Most CitedActiveUnited States (USPTO)Utility

Blowout preventer testing system and method

29Forward Citations (#2431295 Global)
1.8/yrCitation Velocity (#2501674 Global)
3.41Citation PageRank (#6163768 Global)
8Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and apparatus for testing a blowout preventer (BOP) wherein a pressurization unit applies fluid to an isolated portion of the throughbore of the BOP. A signal that is representative of the actual pressure in the isolated portion of the throughbore over successive time points and a pre-determined non-deterministic finite state automaton are used to predict the pressure in the isolated portion of the throughbore as a function of time relative to a pre-determined acceptable leak rate and the time at which stability is achieved. In one embodiment stability is achieved when successive predicted pressures are within a predetermined difference over a predetermined interval of time. Visual indications are provided to depict the progress of testing.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 29.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for testing a system comprising: a blowout preventer (BOP) having an upper end and a wellhead end, having a throughbore between the ends, and at least one means for closing the throughbore against a tubular located therein; a cementing unit (CU) for providing pressurized fluid; and piping for connecting the output of the CU to the BOP and into the throughbore of the BOP, the method comprising the steps of: a) shutting the closing means in the BOP against the exterior of said tubular; b) using the CU and the piping to increase the pressure in a portion of the throughbore around the tub

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 29 total)

PatentTitleYearCitations
US 2014123747 A1Systems and methods for conducting pressure tests on a wellbore fluid containment system—10
US 10,323,496 B2System and console for monitoring and managing casing running operations at a well site20190
US 12,061,133 B2Methods and apparatus for measuring impact of solar irradiance on hydrostatic pressure testing20242
US 9,175,539 B2Methods and systems for pressure testing components of a hydrocarbon well system20158
US 10,323,502 B2System and console for monitoring and managing tripping operations at a well site20190
US 8,196,665 B2Method and apparatus for containing an oil spill caused by a subsea blowout201216
US 10,323,497 B2System and console for monitoring and managing well site operations20190
US 8,025,103 B1Contained top kill method and apparatus for entombing a defective blowout preventer (BOP) stack to stop an oil and/or gas spill201134
US 10,018,007 B2Systems and methods to visualize component health and preventive maintenance needs for subsea control subsystem components20183
US 10,428,637 B2System and console for monitoring and managing well site operations20190
US 10,260,332 B2System and console for monitoring and managing well site operations20195
US 11,047,221 B2System and console for monitoring and managing well site operations20210
US 10,436,014 B2System and console for monitoring and managing pressure testing operations at a well site20192
US 10,301,922 B2System and console for monitoring and managing cementing operations at a well site20193
WO 2013/176648 A1Methods and systems for pressure testing components of a hydrocarbon well system—0

Non-Patent Literature (1)

  • James H. Stapleton, Linear Statistical Models, 1995, John Wiley & Sons, Inc., p. 145-152.