Closed loop control system for controlling production of hydrocarbon fluid from an underground formation
Abstract
A method is disclosed for controlling production of oil and/or gas from an underground reservoir by means of a closed loop production control system, in which: an assembly of monitoring sensors ( 4 ) monitor the physical properties of hydrocarbon and other fluids within the reservoir; a plurality of high order and/or low order mathematical reservoir models ( 5,7 ) calculate each an estimate of the physical properties of hydrocarbon and other fluids in the hydrocarbon containing formation and in the wells; the mathematical reservoir models ( 5,7 ) are iteratively updated in response to data provided by the assembly of sensors such that any difference between the properties monitored by the assembly of sensors and those calculated by each of the reservoir models is minimized; an optimal mathematical reservoir model ( 5,7 ) or an optimal combination thereof is selected during at least one updating step for which an averaged difference between the calculated properties and the properties monitored by the assembly of sensors ( 4 ) is minimal; and an optimization algorithm ( 8 ) controls, on the basis of data provided by the selected optimal mathematical reservoir model or optimal combin
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 29.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of controlling production of hydrocarbon fluid from an underground hydrocarbon containing formation by means of a closed loop production control system in which: an assembly of monitoring sensors monitor the flux or other physical properties of hydrocarbon or other fluids within the formation; a plurality of mathematical reservoir models calculate each an estimate of the flux or other physical properties of hydrocarbon and other fluids within the formation; the mathematical reservoir models are each iteratively updated in response to data provided by the assembly of sensors such that
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 29 total)
References Cited — Backward Prior Art (6)
Non-Patent Literature (5)
- Alan Beamer: "From pore to pipeline, field-scale solutions", Oilfield Review, Summer 1998, pp. 2-19.
- D R Brouwer, J D Jansen: "Dynamic optimization of water flooding with smart wells using optimal control theory", SPE 13th European Petroleum Conference, Aberdeen, Scotland, U.K. Oct. 29-31, 2002.
- D.J. Rossi,O. Gurpinar, R. Nelson, S. Jacobsen: "Discussion on integrating monitorino data into the reservoir management process", 2000 Society of Petroleum Engineers European Petroleum Conference, Paris, France, Oct. 24-25, 2000.
- D.R. Brouwer, G. Naevdal, J.D. Jansen, E.H. Vefring, C.P.J.W. Van Kruijsdijk: "Improved reservoir management through optimal control and continujous model updating", Society of Petroleum Engineers, No. 90149, Sep. 2004, pp. 1-11.
- F. Nyhavn, and F. Vassenden: "Reservoir drainage with downhole permanent monitoring and control systems. Real-time integration of dynamic reservoir performance data and static reservoir model improves control decisions", 2000 SPE Annual Technical Conference and Exhibition, Dallas, Texas, Oct. 1-4, 2