Cup tool with three-part packoff for a high pressure mandrel
Abstract
A cup tool for use with a high-pressure mandrel of a wellhead isolation tool has a three-part packoff assembly that slides over a cup tool tube from an unset position to a set position. The three-part packoff assembly includes an elastomeric cup, a rigid alignment ring located above the elastomeric cup and an elastomeric packoff element located above the rigid alignment ring. The rigid alignment ring helps ensure that the elastomeric cup remains correctly aligned in a casing or tubing that is not straight, is out of round or is washed, and helps ensure that the elastomeric packoff achieves a high-pressure seal in the set position, even under adverse downhole conditions.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 2.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A cup tool for providing a high-pressure fluid seal within a casing or a production tubing, comprising: a cup tool tube adapted to be connected to a high-pressure mandrel inserted into the casing or the production tubing; a three-part packoff assembly that slides over the cup tool tube, the three-part pack off assembly comprising an elastomeric cup that surrounds the cup tool tube, a rigid alignment ring that surrounds the cup tool tube above a top end of the elastomeric cup, an annular groove in a bottom surface of the rigid alignment ring, and an elastomeric packoff element that surrounds th
- Claim 2Depends on #1
The cup tool as claimed in claim 1 wherein the elastomeric cup comprises a depending skirt having an open bottom end that forms a sealed cavity around the cup tool tube, the sealed cavity being closed at a top en
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗