Patents
US 7,657,682 B2#26965275 Most CitedActiveUnited States (USPTO)Utility

Bus interconnect with flow control

4Forward Citations (#26965275 Global)
0.2/yrCitation Velocity (#28735174 Global)
1.13Citation PageRank (#35175289 Global)
16Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A method of operating a bus interconnect coupled to bus masters and bus slaves is provided. The method includes receiving a request from a bus master to perform a bus transaction associated with a transaction ID with a bus slave of the plurality of bus slaves, the bus transaction being a first type of bus transaction. The method further includes performing the transaction if a resource allocation parameter allocated to the bus master meets a first threshold. The method further includes if the resource allocation parameter does not meet the first threshold, performing the data transaction only if the transaction meets a condition of a set of at least one condition, wherein a condition of the set of at least one condition includes that the transaction ID of the transaction is not a transaction ID of any outstanding bus transaction of the first type requested by the bus master.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 4.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of operating a bus interconnect coupled to a plurality of bus masters and a plurality of bus slaves, the method comprising: receiving a request from a bus master of the plurality of bus masters to perform a bus transaction associated with a transaction ID with a bus slave of the plurality of bus slaves, the bus transaction being a first type of bus transaction; performing the transaction if a resource allocation parameter allocated to the bus master meets a first threshold; and if the resource allocation parameter does not meet the first threshold, performing the data transaction only

  2. Claim 2Depends on #1

    The method of claim 1 wherein: the resource allocation parameter is an amount of data associated with outstanding bu

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗