Methods and computer systems for reducing runtimes in material requirements planning
Abstract
Methods and computer systems are provided for reducing the runtime of a material requirements planning run. In one embodiment, a computer system loads a plurality of bills of materials into a data structure. The computer system may analyze parent-child relationships between components of the plurality of bills of materials in the data structure and set for each component in the data structure a counter value that indicates the number of parent components for each component. The counter value of a specific child component may be decremented when the planning of a parent component of the specific child component is completed. The computer system may then proceed with the planning of the specific child component if the associated counter value indicates that the planning of all parent components of the specific child component is completed.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 3 · Forward citations: 29.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for material requirements planning, the method being executed by a computer and comprising: loading, by using a processor of the computer, a plurality of bills of materials into a data structure stored in a storage device of the computer, the bills of materials having components with planning levels and the components being arranged in parent-child relationships, wherein the components include a specific child component having a specific planning level; analyzing, by using the processor, parent-child relationships between components of the plurality of bills of materials in the data s
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗