Method for autonomic control of a manufacturing system

15Forward Citations (#6441183 Global)
0.9/yrCitation Velocity (#7631545 Global)
2.19Citation PageRank (#12610125 Global)
18Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Disclosed is a method of controlling a manufacturing system. The invention automatically monitors current levels of partially completed products waiting to be processed by a tool (or group of tools) and determines whether the current levels exceed a predetermined limit. If the current levels do exceed the predetermined limit, the invention performs an optimization process. However, if the current levels do not exceed the predetermined limit, the invention performs a dispatching process. In this dispatching process, the invention automatically projects future levels of partially completed products that will be supplied to the tool to identify a future work-in-process (WIP) bubble. The WIP bubble occurs when larger than normal amounts of partially completed products are supplied to the tool. The invention automatically adjusts the operating parameters of the tool based upon both the current levels and the future levels.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 15.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of controlling a manufacturing system, said method comprising: monitoring, by a computer system, current levels of partially completed products within lots waiting to be processed by at least one tool in said manufacturing system; determining, by said computer system, whether said current levels exceed a predetermined limit, and automatically adjusting, by said computer system, scheduling criteria for said lots, depending upon whether said current levels exceed said predetermined limit, wherein said automatically adjusting of said scheduling criteria comprises: when said current level

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗