Film resource manager
Abstract
Post-production processing may be performed by receiving a film-processing order, determining a process useful in fulfilling film-processing order, identifying one or more resources available to perform the process useful in fulfilling the film-processing order, and scheduling with at least one of the identified resources to perform the process.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A resource manager configured to process motion picture films, the resource manager comprising: a first communications interface structured and arranged to receive a motion picture film-processing order to process a motion picture film; a requirement controller structured and arranged to identify a workflow to fulfill the motion picture film-processing order; a dedicated identification controller structured and arranged to identify a dedicated motion picture film-processing resource that is capable of performing a first post-production process; a reconfiguration controller structured and arran
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Choi et al., Design of a Flexible Open Platform for High Performance Active Networks, 1999, St. Louis, Missouri.
- Keller et al., An Active Router Architecture for Multicast Video Distribution, St. Louis, Missouri.
- Lockwood et al., Reprogrammable Network Packet Processing on the Field Programmable Port Extender (FPX), 2001, St. Louis, Missouri.
- Office Action for U.S. Appl. No. 10/284,461, Dec. 22, 2006, 12 pages.
- Office Action for U.S. Appl. No. 10/284,461, Jan. 19, 2006, 9 pages.