Method for operation of a wind energy installation
Abstract
A wind energy installation ( 10 ) and a method for operation of a wind energy installation ( 10 ), with the wind energy installation ( 10 ) having a rotor ( 18 ) which can be driven by wind, having at least one rotor blade ( 22 ), a generator for conversion of the mechanical energy of the rotor ( 18 ) to electrical energy, as well as a tower ( 14 ) on which the rotor ( 18 ) is arranged. At least one measurement variable is measured, preferably more than once, by means of a suitable measurement device during. operation of the wind energy installation ( 10 ), which measurement variable is a measure of the bending of the rotor blade ( 22 ) in the tower direction as a result of a given wind load, and is thus a measure of the risk of the rotor blade ( 22 ) colliding with the tower ( 14 ) of the wind energy installation ( 10 ) as it passes the tower, with at least one operating parameter of the wind energy installation ( 10 ) being adjusted as a function of this measurement variable for determination of the rotor blade bending.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 23 · Forward citations: 15.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for operation of a wind energy installation ( 10 ), with the wind energy installation ( 10 ) having a rotor ( 18 ) that is driven by wind and that has at least one rotor blade ( 22 ), a generator for conversion of the mechanical energy of the rotor ( 18 ) to electrical energy, and a tower ( 14 ) on which the rotor ( 18 ) is arranged, comprising the step of measuring at least one measurement variable by means of a suitable measurement device during operation of the wind energy installation ( 10 ), wherein the at least one measurement variable is a measure of the bending of the at least
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 15 total)
References Cited — Backward Prior Art (23)
Non-Patent Literature (2)
- DE Search Report No. 10 2005 048 805.6 dated Aug. 11, 2006.
- EP Search Report No. 10 06 02 0891 dated Jan. 30, 2007.