Wind power installations were initially always erected in the form of individual units and it is only in recent years that, caused also by administrative and building regulations, wind power installations are frequently installed in wind parks. In that respect a wind park in its smallest unit is an arrangement of at least two wind power installations, but frequently markedly more. By way of example mention may be made of the wind park at Holtriem (East Frisia) where more than 50 wind power installations are set up in an array. It is to be expected that the number of units and also the installed power of the wind power installations will also increase greatly in the forthcoming years. In most cases the wind potential is at its greatest in regions of the power supply networks with a low level of short-circuit power and low population density. It is precisely there that the technical connection limits are quickly reached by the wind power installations, with the result that it is then no longer possible for further wind power installations to be set up at such sites. A method of operating a wind park comprising a plurality of wind power installations, wherein the wind park is connecte

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 45 · Forward citations: 33.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of operating a wind park comprising: a plurality of wind power installations, wherein the wind park is connected to an electrical power supply network into which the electrical power produced by the wind park is fed and at least one of the wind power installations of the wind park has a control input, by means of which the electrical power of the wind park installation can be set in a range of between 0 and 100% of the respective power to be made available, and that there is provided a data processing apparatus which is connected to the control input and by means of which the setting

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 33 total)

PatentTitleYearCitations
US 8,860,237 B2System and method of selecting wind turbine generators in a wind park for curtailment of output power to provide a wind reserve20141
DE 102014200740 A1Verfahren und Regel- und/oder Steuereinrichtung zum Betrieb einer Windenergieanlage und/oder eines Windparks sowie Windenergieanlage und Windpark—7
DE 102013208474 A1Verfahren zum Einspeisen elektrischer Leistung in ein elektrisches Versorgungsnetz—14
US 2010280672 A1System for regulating the active power of a wind farm—14
EP 2,346,133 B1Converter device and method for converting electrical power20170
US 7,948,104 B2Method of operating a wind turbine with pitch control, a wind turbine and a cluster of wind turbines201112
US 8,912,674 B2System and method of selecting wind turbine generators in a wind park for change of output power20142
US 11,322,943 B2Method for controlling the restoration of a network20220
US 9,453,497 B2Method for operating a wind farm20161
US 10,320,315 B2Method for controlling wind turbines20190
US 7,800,242 B2Wind energy installation and method of controlling the output power from a wind energy installation201016
US 9,287,814 B2Wind turbine generator and method of controlling the same20163
US 2008093856 A1Wind energy installation and method of controlling the output power from a wind energy installation—22
DE 102014200737 A1Verfahren und Regel- und/oder Steuereinrichtung zum Betrieb einer Windenergieanlage und/oder eines Windparks sowie Windenergieanlage und Windpark—0
US 2010276931 A1Method of operating a wind park—8

Non-Patent Literature (5)

  • "The Benchmark in Windenergy-Technology," Enercon, Aurich, Germany, Dec. 5, 2003, pp. 1-28.
  • ANSI/IEEE, "IEEE Recommended Practice for Utility Interconnection of Small Wind Energy Conversion System," pp. 7-12, Nov. 30, 1987, retrieved from http://ieeexplore.ieee.org/iell/2358/1238/00029137.pdf?is Number=1238&prod=STD&arnumber=29137&arST=&ared=&arAuthor= on Dec. 2, 2002.
  • Arantxa, T. et al., "Digital Simulation Performance of a Wind Farm," in Proceedings of the 10th Mediterranean Electrotechnical Conference, Melecon 2000, vol. III, pp. 1153-1156.
  • Borle et al., "Development and Testing of a 20-kW Grid Interactive Photovoltaic Power Conditioning System in Western Australia," IEEE Transactions on Industry Applications, vol. 33, No. 2, Mar./Apr. 1997, pp. 502-508.
  • Criado, R. et al., "Análisis y Estrategias de Control de la Energia Eólica en el Sistema Eléctrico Español," Cogeneracion y Renovables, pp. 93-103, Nov. 2000, retrieved from http://www.energuia.com/guia/images/DirFich/BIB1002.pdf on Dec. 2, 2002.