Method for constructing and treating subterranean formations
Abstract
A method for servicing a well comprises providing at least one trailer, providing at least one towing vehicle, providing servicing equipment, supporting the equipment with the trailer, and moving the towing vehicle, so as to move the trailer along with the equipment. The combination gross weight rating or combination gross vehicle weight of the trailer and the towing vehicle may be less than 26,001 pounds or less than less than the commercial drivers license threshold, under the Federal Motor Carrier Safety Administration's regulations.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 3.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for servicing a well, the method comprising the steps of: providing at least one trailer; providing at least one towing vehicle; providing servicing equipment, wherein the servicing equipment comprises at least one delivery pump and at least one pumping manifold; supporting the servicing equipment with the trailer; moving the towing vehicle to a worksite for the well, so as to move the trailer along with the servicing equipment; and servicing the well at least in part with the delivery pump and one or more treatment materials; wherein the combination gross weight rating or combination
- Claim 2Depends on #1
The method of servicing a well of claim 1 , wherein the servicing equipment further comprises equipment used in hauling material, the eq
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Brochure, Enventure Global Technology, "Expandable-Tubular Technology," pp. 1-6, 1999.
- Carpenter, et al., "Remediating Sustained Casing Pressure by Forming a Downhole Annular Seal with Low-Melt-Point Eutectic Metal," IADC/SPE 87198, Mar. 2-4, 2004.
- Daigle, et al., "Expandable Tubulars: Field Examples of Application in Well Construction and Remediation," Society of Petroleum Engineers, SPE 62958, Oct. 1-4, 2000.
- Davies, et al, "Reverse Circulation of Primary Cementing Jobs-Evaluation and Case History," IADC/SPE 87197, Mar. 2-4, 2004.
- DeMong, et al., "Breakthroughs Using Solid Expandable Tubulars to Construct Extended Reach Wells," IADC/SPE 87209, Mar. 2-4, 2004.