US 7,610,112 B2#18589738 Most CitedActiveUnited States (USPTO)Utility

Method for manufacturing with engineering change override

6Forward Citations (#18589738 Global)
0.3/yrCitation Velocity (#22470666 Global)
1.37Citation PageRank (#26287075 Global)
20Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The illustrative embodiments provide a computer implemented method, apparatus, and computer usable program code for processing orders. A request for delivery by a requested delivery date is received for an order having an original delivery date. The ordered product is broken down into one or more materials required for manufacturing the ordered product. For at least one material required for manufacturing the ordered product, a date when an engineering change becomes effective for the material is specified. An alternate bill of materials is created based on the specified date when the engineering change becomes effective for the material. An alternate manufacturing plan based on the alternate bill of materials is created. Manufacturing is initiated based on the alternate manufacturing plan. If manufacturing can be completed in time for delivery by the requested delivery date, the original delivery date of the order is replaced with the requested delivery date.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 6.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer program product stored in a computer usable medium including computer usable program code when executed by a computer for processing orders, said computer program product comprising: computer usable program code for receiving a request for delivery of an order by a requested delivery date; computer usable program code, responsive to receiving the request for delivery of the order by the requested delivery date, for specifying a date when an engineering change becomes effective for at least one material required for the order outside of a material requirements planning system, wherei

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (20)

PatentTitleYearCitations
EP 0,425,406 A2An automated system for engineering change implementation to minimize wastage of obsoleted items—7
US 5,099,431 AAutomated re-work shop order scheduling system1992141
US 5,216,612 AIntelligent computer integrated maintenance system and method1993524
US 5,311,424 AMethod and system for product configuration definition and tracking1994253
US 5,315,509 AArtificial intelligence system for item analysis for rework shop orders199466
US 5,574,640 ACase-based scheduling method for creating a schedule199630
US 5,777,877 AProcessing device and method for making arrangements for parts used in products199870
US 6,041,267 AMethod to provide common support for multiple types of solvers for matching assets with demand in microelectronics manufacturing200093
US 6,064,982 ASmart configurator2000209
US 6,594,535 B1Material and inventory control system for a demand flow process2003107
US 2004059615 A1System and method for planning and executing an engineering change—20
US 6,853,981 B1Method and system for processing customer requests and generating associated information correlated to ordered products20058
US 2005055260 A1Distribution management system—15
US 2005065833 A1Production scheduling management method and production scheduling management program—10
US 2005090921 A1Method for optimizing material substitutions within a supply chain—12
US 2005261887 A1Time dependent process parameters and engineering change number conflict report—6
US 7,103,434 B2PLM-supportive CAD-CAM tool for interoperative electrical and mechanical design for hardware electrical systems2006142
US 7,200,454 B2Method, system, and storage medium for integrating rework operations into an advanced planning process200719
US 2007239304 A1A method for calculating a materials requirements plan for demands containing multiple demand dates and priorities—15
US 2007265959 A1Systems, applications and products in data processing for credit check—10

Non-Patent Literature (1)

  • Folmar et al., "Automated Management and Control of an Engineering Change", IBM Technical Disclosure Bulletin n4a, Sep. 1992, pp. 189-194.