Method for manufacturing with engineering change override
Abstract
The illustrative embodiments provide a computer implemented method, apparatus, and computer usable program code for processing orders. A request for delivery by a requested delivery date is received for an order having an original delivery date. The ordered product is broken down into one or more materials required for manufacturing the ordered product. For at least one material required for manufacturing the ordered product, a date when an engineering change becomes effective for the material is specified. An alternate bill of materials is created based on the specified date when the engineering change becomes effective for the material. An alternate manufacturing plan based on the alternate bill of materials is created. Manufacturing is initiated based on the alternate manufacturing plan. If manufacturing can be completed in time for delivery by the requested delivery date, the original delivery date of the order is replaced with the requested delivery date.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 6.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer program product stored in a computer usable medium including computer usable program code when executed by a computer for processing orders, said computer program product comprising: computer usable program code for receiving a request for delivery of an order by a requested delivery date; computer usable program code, responsive to receiving the request for delivery of the order by the requested delivery date, for specifying a date when an engineering change becomes effective for at least one material required for the order outside of a material requirements planning system, wherei
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (20)
Non-Patent Literature (1)
- Folmar et al., "Automated Management and Control of an Engineering Change", IBM Technical Disclosure Bulletin n4a, Sep. 1992, pp. 189-194.