Completion method for fracturing and gravel packing
Abstract
In one embodiment telescoping members are extended to bridge an annular gap either before or after it is cemented. Some of the telescoping members have screens and others have flow passages that can be selectively opened with associated valves to frac an interval in any order desired. The valves are then closed after the frac job and the other telescoping members are made to allow screened flow from the fractured formation. In another embodiment an interval to be gravel packed and fractured has a series of screens and selectively opened valves on a bottom hole assembly such as a liner. One or more external packers are provided. The entire interval is gravel packed at one time followed by packer actuation and then selective opening of ports to conduct a fracture operation in any of the zones defined by the set packers and in any desired order.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 35 · Forward citations: 22.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A completion method, comprising: running in a bottom hole assembly comprising at least two screen sections, at least one valved port adjacent at least one of said screens for selective communication between internally and externally of a string comprising said screen sections and at least one external isolator between said screens; positioning said assembly adjacent an interval to be produced; gravel packing an annular space to cover said screen sections; subdividing said annular space after said gravel packing with said external isolator whose actuation sealingly isolates portions of said ann
- Claim 2Depends on #1
The method of claim 1 , comprising: positioning said external isolator between said screen sections.
- Claim 3Depends on #2
The method of claim 2 , com
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 22 total)
References Cited — Backward Prior Art (35)
Non-Patent Literature (3)
- Vickery, Harold, et al., "New One-Trip Multi-zone Frac Pack System with Positive Positioning", SPE 78316, Oct. 2002, 1-8.
- Vickery, Harold, et al., "One-Trip Multizone Frac Packs in Bohai Bay-A Case Study in Efficient Operations", IADC/SPE 88023, Sep. 2004, 1-10.
- Vickery, Harold, et al., "One-Trip Multizone Frac Packs in Bohai Bay-A Case Study in Efficient Operations", ISPE 90173, Sep. 2004, 1-10.