Patents
US 7,590,463 B2#61829278 Most CitedActiveUnited States (USPTO)Utility

Supply consumption optimization and multiple component utilization

1Forward Citations (#61829278 Global)
0.1/yrCitation Velocity (#53046584 Global)
0.74Citation PageRank (#61829278 Global)
33Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The invention disclosed here is a method for achieving simultaneous consideration of multiple independent dates associated with a single demand. The method iterates through the demands to match the demands with the supply quantities respecting demand priorities which vary over time and demand quantities which may perish over time. One embodiment of the invention allocates demand to supply through an iterative process beginning with earlier demand requirement dates and concluding with later demands which may preempt supply from earlier demands depending upon their relative priorities. An additional embodiment transforms the demands to create multiple demand records, each having an associated priority, such that a single original demand record is transformed into a plurality of related demand records, each having an associated priority. The component supply quantities are accumulated into period ending inventories. The method matches the multiple demand records (in priority sequence) to the period ending inventories.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 33 · Forward citations: 1.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer-implemented method of allocating supplies among competing demands comprising: providing projected supply quantities of a supply, wherein said supply quantities are different for different time periods; providing demands on said supply, wherein said demands have priorities such that at least one of said demands has multiple requirement dates for said supply having different priorities, wherein, for each of said demands, earlier requirement dates of said multiple requirement dates have a different priority than later requirement dates of said multiple requirement dates; and allocating

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

PatentTitleYearCitations
US 11,494,781 B2Buyback provision mechanism20220

References Cited — Backward Prior Art (33)

PatentTitleYearCitations
US 5,216,612 AIntelligent computer integrated maintenance system and method1993524
US 5,548,518 AAllocation method for generating a production schedule1996189
US 5,699,259 AInventory control procedure199771
US 5,751,580 AFuzzy logic method and system for adjustment of priority rating of work in process in a production line199899
US 5,787,000 AMethod and apparatus for scheduling work orders in a manufacturing process1998134
US 5,818,716 ADynamic lot dispatching required turn rate factory control system and method of operation thereof1998140
US 5,971,585 ABest can do matching of assets with demand in microelectronics manufacturing1999184
US 6,088,626 AMethod and apparatus for scheduling work orders in a manufacturing process2000144
US 6,272,389 B1Method and system for capacity allocation in an assembly environment200150
US 6,434,443 B1Method for performing dynamic re-scheduling of fabrication plant200256
US 2002198757 A1Method for allocating limited component supply and capacity to optimize production scheduling—60
US 6,584,370 B2Method of calculating low level codes for considering capacities200328
US 2003149631 A1System and method for order planning with attribute based planning—98
US 6,701,201 B2Decomposition system and method for solving a large-scale semiconductor production planning problem2004104
US 6,731,999 B1Wafer start order release algorithm in a foundry fab200424
US 2004186605 A1Balancing work release based on both demand and supply variables—25
US 2005096771 A1Method for sizing production lot starts within a linear system programming environment—28
US 2005171828 A1A method for considering hierarchical preemptive demand priorities in a supply chain optimization model—42
US 2005171786 A1Method for fair sharing limited resources between multiple customers—16
US 2005171824 A1Method for simultaneously considering customer commit dates and customer request dates—15
US 2005171625 A1A method for optimizing foundry capacity—26
US 2005177465 A1Method for identifying product assets in a supply chain used to satisfy multiple customer demands—25
US 7,058,587 B1System and method for allocating the supply of critical material components and manufacturing capacity2006220
US 2006282343 A1Paper manufacturing system and method—20
US 7,197,469 B2Method for allocating limited component supply and capacity to optimize production scheduling200750
US 2007239297 A1Supply consumption optimization and multiple component utilization—17
US 2007239304 A1A method for calculating a materials requirements plan for demands containing multiple demand dates and priorities—15
US 7,286,889 B1Method for resource allocation and re-grouping recognizing competing priorities which vary by date200717
US 7,292,904 B2Method for sizing production lot starts within a linear system programming environment200721