Patents
US 7,590,109 B2#20127899 Most CitedActiveUnited States (USPTO)Utility

Data burst scheduling

5Forward Citations (#20127899 Global)
0.3/yrCitation Velocity (#26119671 Global)
1.67Citation PageRank (#19311990 Global)
8Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

Methods and apparatus for scheduling transfer of data bursts in a network comprising electronic edge nodes interconnected by bufferless core nodes are disclosed. Each edge node comprises a source node and a sink node, and each core node comprises several bufferless space switches operating in parallel. Each space switch has a master controller and one of the master controllers in a core node functions as a core-node controller. Each master controller has a burst scheduler for computing a schedule for transfer of data bursts, received from source nodes, to respective destination sink nodes. A core-node controller receives requests for bitrate allocations from source nodes and assigns each request to one of the master controllers of the core node. In one embodiment, a scheduler determines schedules for concatenated reconfiguration periods. In another embodiment, parallel schedulers determine schedules for overlapping reconfiguration periods.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 5.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method for switching data bursts with a bufferless space switch having a plurality of burst-mode input ports and a plurality of output ports, comprising: determining a schedule for switching data bursts, over a designated schedule period T, from said plurality of burst-mode input ports to said plurality of output ports; repetitively employing said schedule for switching data bursts during m consecutive periods, m being an integer greater than zero and each of said consecutive periods is equal to said designated schedule period; and setting m to exceed a ratio of a time interval required to c

  2. Claim 2Depends on #1

    The method of claim 1 further comprising computing said schedule once every m consecutive schedule periods.

  3. Claim 3Depends on #2

    The method of claim 2 further comprising generating said schedule for a succession o

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗