Pull to customer order demand fulfillment system and method
Abstract
A demand fulfillment system and method that uses customer orders to generate a work schedule and a material delivery schedule for a factory that mass produces items, particularly commodities, built to customer order. The demand fulfillment system enables the manufacturer to operate the factory with minimal in-house inventory of parts and/or raw materials by only scheduling work for which inventory is available. Parts and/or raw materials are requested and delivered to an operation of at least one operation on a manufacturing line in the factory from in-house and external inventory based upon the work scheduled for that operation.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 12.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for scheduling production of at least one item on at least one manufacturing line based upon customer orders and availability of materials used for the manufacture of the at least one item, said method comprising the steps of: (a) receiving at least one customer order for at least one item, the step of receiving the at least one customer order being performed by a work-in-progress (WIP) tracking and control module executing on a computer system; (b) storing the at least one customer order for the at least one item as WIP data in a WIP data memory of the computer system; (c) developing
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (15)
Non-Patent Literature (3)
- "Manugistics Introduces Industry's Only Extended Supply Chain Management Solution." PR Newswire, p. 0114NETU009, Jan. 14, 1997.
- Henry K. Graves, et al., Inventory Management Method and Apparatus, Published Aug. 4, 1998, United States Statutory Invention Registration No. H1743.
- Layden, John E. "A Rapidly Changing Landscape." Manufacturing Systems, pp. 10A-18A, Mar. 1996.