Multi-building control for demand response power usage control
Abstract
An energy usage coordinator controls the energy usage of individual buildings of a group (or portfolio) of buildings in one or more load zones. These buildings have all contracted with an energy company which controls (directly or indirectly) the energy usage coordinator. By agreeing to lower energy usage during times of peak usage (when the energy company may otherwise have to pay very high prices on the spot or short term market), the owners or managers of the buildings receive a preferential energy rate from the energy company. Such a preferential rate may be in the form of a fixed rate reduction or a variable rate reduction. Alternatively, the energy company may determine that the energy is currently selling for twice what its building portfolio has contracted to pay for it so it requests some portion of the portfolio to reduce usage so that it can sell the excess/saved energy in the market.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 67.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for controlling energy usage within a portfolio of buildings, each building receiving energy service from a same energy company, the system comprising: an energy usage estimation system for tracking a projected energy usage of the buildings in the portfolio of buildings and for determining if a condition requires a change in energy usage by at least one building in the portfolio of buildings; and an energy usage coordinator for communicating (1) a first request with a first controller of a first high energy device at a first building in the portfolio of buildings to request that the f
- Claim 2Independent Claim
The syst
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 67 total)
References Cited — Backward Prior Art (14)
Non-Patent Literature (1)
- International Search Report and Written Opinion mailed Nov. 3, 2008 in PCT/US08/09700.