Powered auxiliary hoist mechanism for a gantry crane
Abstract
A gantry crane ( 10 ) is configured in a panel turner application. The gantry crane ( 10 ) generally includes a gantry crane structure ( 14 ) having a first cross-beam ( 28 ) and a second cross-beam ( 30 ). A first main hoist mechanism ( 40 ) and a first auxiliary hoist mechanism ( 42 ) are coupled to the first cross-beam ( 28 ), and a second main hoist mechanism ( 44 ) and a second auxiliary hoist mechanism ( 46 ) are coupled to the second cross-beam ( 30 ). The crane ( 10 ) includes a hydraulic system configured to reduce the lift capacity of the first and/or second main hoist mechanism ( 40, 44 ), and to equalize the hoist capacity between the first and second main hoist mechanisms ( 40, 44 ) or the first and second auxiliary hoist mechanisms ( 42, 46 ) in certain applications. The auxiliary hoist mechanism ( 42, 46 ) are configured for powered movement along the respective cross-beams ( 28, 30 ).
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 29.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A gantry crane comprising: a first side support frame; a second side support frame; a first cross-beam having a first end connected to the first side support frame and a second end connected to the second side support frame; a second cross-beam having a first end connected to the first side support frame and a second end connected to the second side support frame, the second cross-beam being spaced from the first cross-beam; a first hoist mechanism on the first cross-beam, the first hoist mechanism having a first main hoist mechanism and a first auxiliary hoist mechanism and a first drive asse
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗