Patents
US 7,546,255 B2#10657553 Most CitedExpiredUnited States (USPTO)Utility

Inventory system

10Forward Citations (#10657553 Global)
0.6/yrCitation Velocity (#13574107 Global)
1.85Citation PageRank (#16396995 Global)
28Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and system that provides the functions to search for material that would fit an order or search for order that a piece of material would fit. For that, the system considers the technical specification defined in the processing route assigned to the orders, domain-expert knowledge for check for feasible matches, and a flexible plant model to specify valid feasible stock areas for searching. This system allows complete visibility of all material in a plant and its suitability to be applied to the customer orders. A second aspect of this invention is a material re-allocation method and system. In accordance with this system, each coil to be processed by the finishing area receives a surface defect map. This map indicates the location of the defects and their characteristics.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 10.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer implemented method for allocating finished units in a production facility to orders received from customers for those units, the computer implemented method comprising the steps: identifying, via one or more computers, orders from customers for finished units; identifying, via said one or more computers, finished units in production at a defined time and available to fill said orders; identifying, via said one or more computers, defects in the finished units and defects that the customers are willing to accept; of said identified finished units, identifying, via said one or more com

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (28)

PatentTitleYearCitations
US 4,459,663 AData processing machine and method of allocating inventory stock for generating work orders for producing manufactured components1984185
US 4,924,386 AMethods and apparatus for efficient resource allocation199086
JP H0325668 AStock allocation controller—5
US 5,148,370 AExpert system and method for batch production scheduling and planning1992109
US 5,216,593 AMethod and apparatus for discrete activity resourse allocation through cardinality constraint generation1993201
US 5,231,567 AManufacturing planning system1993131
US 5,237,495 AProduction/purchase management processing system and method1993106
US 5,251,290 AModeling method for sorting dependencies among geometric entities1993101
US 5,255,181 AMethod of planning organizational activities1993195
US 5,280,425 AApparatus and method for production planning1994106
JP H0628369 AInventory allocation/delivery order producing device—5
US 5,291,394 AManufacturing control and capacity planning system1994120
US 5,630,070 AOptimization of manufacturing resource planning1997578
US 5,630,123 ASoftware system utilizing a filtered priority queue and method of operation199780
US 5,734,592 AMethod for determining a ranked set of associations199828
US 5,737,728 ASystem for resource assignment and scheduling1998271
US 5,841,958 ABipartite matching199835
US 5,943,652 AResource assignment and scheduling system1999251
US 5,946,663 AMethod of planning a production schedule and an apparatus for planning a production schedule199950
US 5,983,195 AMethod and system for scheduling product orders in a manufacturing facility199959

Non-Patent Literature (5)

  • ECECS 543 Lecture Notes, "Matching", http://cheng.ececs.uc.edu/cs543/5/22.html, May 22, 1997.
  • Kalagnanam, Jayant, Dawande, Milind, Trumbo, Mark, Lee, Ho; IBM Research Report Inventory Matching Problems in the Steel Industry; RC 21171; May 4, 1998.
  • Lee, H.S., et al., (1996), "Primary production scheduling at steelmaking industries," IBM J. Res. Develop., vol. 40, No. 2.
  • Production Planning and Scheduling, Functional Architecture, Itabira Special Steels Co., Acesita, IBM Applied Manufacturing Technologies, Atlanta, USA/Brazil, Jun. 1996.
  • Production, Planning and Scheduling (ACESITA ), Jun. 1996.