Method and apparatus for on-demand resource allocation and job management
Abstract
The invention is a method and apparatus for on-demand resource planning for unified messaging services. In one embodiment, multiple clients are served by a single system, and existing system resources are allocated among all clients in a manner that optimizes system output and service provider profit without the need to increase system resources. In one embodiment, resource allocation and job scheduling are guided by individual service level agreements between the service provider and the clients that dictate minimum service levels that must be achieved by the system. Jobs are processed in a manner that at least meets the specified service levels, and the benefit or profit derived by the service provider is maximized by prioritizing incoming job requests within the parameters of the specified service levels while meeting the specified service levels. Thus, operation and hardware costs remain substantially unchanged, while system output and profit are maximized.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 12.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for optimizing an allocation of system resources, comprising: determining, for each source from which a system receives job requests, a minimum percentage of job requests to be processed by the system, where the system receives job requests from at least two separate sources; allocating system resources among the at least two separate sources to meet at least one job processing obligation and to maximize a total profit of the system; and scheduling a processing order of new job requests on-line, wherein said scheduling is accomplished by: determining a completion deadline for a new jo
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (5)
Non-Patent Literature (2)
- Kise, et al., "A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times," Operations Research, 26(1), Jan.-Feb. 1978, 121-126.
- Towsley, et al., "On the Optimality of Minimum Laxity and Earliest Deadline Scheduling for Real-Time Multiprocessors," Proc. of EUROMICRO Workshop on Real Time, Jun. 1990, pp. 17-24.